Construction of 2x10MVA, 33/6.6kV and 2x2.5MVA,6.6/0.415kV Substation to supply power at STAMIGOLD
Construction of the Control Room at the STAMIGOLD Substation
Explore our comprehensive portfolio of electrical transmission and distribution projects that have powered Tanzania's growth and development.
Construction of the Control Room at the STAMIGOLD Substation
Construction of 33kV line from Nyakanazi to Kakonko
Construction of 2x10MVA, 33/6.6kV and 2x2.5MVA,6.6/0.415kV Substation to supply power at STAMIGOLD mine
Construction of 132 kV Transmission line of 383km from Tabora to Katavi
Construction of 132 kV Transmission line of 383km from Tabora to Katavi
CONSTRUCTION OF DISTRIBUTION NETWORKS AT VARIOUS AREAS IN DODOMA REGION COMPLETED IN JUNE 2021
MAINTENANCE OF KARATU FEEDERS IN ARUSHA REGION COMPLETED IN FEBRUARY 2021
UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI MKOA WA MBEYA
UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI MKOA WA MBEYA
WAFANYAKAZI WA ETDCO WAKIWA KWENYE UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI
UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI MKOA WA MBEYA
UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI MKOA WA KATAVI .
UZINDUZI WA MRADI WA KUSAMBAZA UMEME VIJIJINI (REA) AWAMU YA TATU MZUNGUKO WA PILI MKOA WA KATAVI.
Construction of new distribution lines for various feeders in Kilimanjaro
Supply and installation of Medium and Low Voltage and Distribution transformer in Kigoma Region
Supply and installation of Medium and Low Voltage and Distribution transformer
Construction of concrete pole section for power line from Morogoro to JNHPP .
The substation will receive electricity from Mahumbika substation and distribute it to Ruangwa
Phase II of Power Supply to the Julius Nyerere Hydro Power Project
Construction of 33kV interconnector line to connect Tunduru from Namtumbo network under Lot II
The project started on 28th April 2019. It was expected to be completed by end of May 2020. The progress of implementat...
The aim of this project was to bring enough and reliable power supply to Lindi, Ruangwa, and Masasi.